Tuesday, 06 Oct 2026 Breaking: Backbone of German fleet: A400M military aircraft takes part in Exercise Tarang Shakti 2026 in Jodhpur
BREAKING: Apple launches AI platform | Tesla earnings beat estimates | Nvidia stock surges | Bitcoin crosses major resistance
Business

US Dept of Energy announces up to USD 4.2 bn financing for nuclear upgrades in Pennsylvania, Ohio

US Dept of Energy announces up to USD 4.2 bn financing for nuclear upgrades in Pennsylvania, Ohio

Washington [US], October 6 (ANI): The US Department of Energy (DOE) has announced a conditional loan commitment of up to USD 4.2 billion to finance upgrades and modernisation of Vistra’s nuclear power plants in Pennsylvania and Ohio, with the projects expected to add 433 megawatts (MW) of nuclear capacity and extend reactor operations by another 20 years.
The investment is aimed at increasing electricity generation from existing nuclear plants while preserving nearly 4 gigawatts (GW) of reliable baseload power, enough to supply more than 3 million homes, the DOE said in a post on X.
The projects are also intended to help meet rising power demand across the 13-state PJM Interconnection region.
US Energy Secretary Chris Wright said the investment would help increase power generation from existing plants without waiting for new nuclear facilities to be built.
“By getting more power out of the nuclear plants we already have, we can deliver more affordable, reliable, around the-clock energy for American families and businesses,” Wright said.
The planned investments cover Vistra’s Beaver Valley nuclear plant in Pennsylvania and Davis-Besse and Perry plants in Ohio. The projects will increase electricity generation from the existing facilities without requiring new transmission corridors or equivalent new generation resources, according to the DOE.
The projects are expected to support around 3,000 project-related jobs in engineering, construction and planned outage work, while also preserving thousands of permanent jobs.
The DOE said the financing would support the plants’ operations for an additional 20 years beyond their existing licences, pointing to a longer operating horizon for the facilities and their contribution to regional power supply.
Gregory A. Beard, Director of the DOE’s Office of Energy Dominance Financing, said the projects would support increased nuclear generation over the longer term.
“These investments will extend the life of existing reactors, increase nuclear generation, and deliver abundant, around-the-clock power to lower costs and power American prosperity for decades to come,” Beard said.
The conditional commitment also includes an option to finance potential future uprates at Vistra’s Comanche Peak Nuclear Power Plant in Texas, potentially extending the scope of the financing beyond Pennsylvania and Ohio.
While the conditional commitment indicates DOE's intent to provide a loan, Vistra must meet technical, legal, environmental and financial conditions before the Department enters into definitive financing documents and funds the loan. (ANI)

Tags

Related News

Adani Power, Bhutan's DGPC sign pact for 770 MW hydropower project; construction to begin in H1 2027
Business
Adani Power, Bhutan's DGPC sign pact for 770 MW hydropower project; construction to begin in H1 2027

<p>Ahmedabad (Gujarat) [India], October 6 (ANI): Adani Power and Bhutan's state-owned Druk Green Power Corporation (DGPC...

Markets extend recovery; Sensex up 140 points, Nifty above 22,500; bank stocks lead
Business
Markets extend recovery; Sensex up 140 points, Nifty above 22,500; bank stocks lead

<p>Mumbai (Maharashtra) [India], October 6 (ANI): Indian equity markets extended their recovery on Tuesday but opened on...

Auto retail hits ‘Best-Ever September’ with 25.37 lakh units, five of six categories at record: FADA
Business
Auto retail hits ‘Best-Ever September’ with 25.37 lakh units, five of six categories at record: FADA

<p>New Delhi [India], October 6 (ANI): Automobile retail sales in India rose 31.82 per cent year-on-year to a record 25,...

RBI seen beginning rate-hike cycle, repo rate may reach 6% by FY27 as inflation risks rise: Reports
Business
RBI seen beginning rate-hike cycle, repo rate may reach 6% by FY27 as inflation risks rise: Reports

<p>New Delhi [India], October 6 (ANI): The Reserve Bank of India is seen beginning a rate-hike cycle that could take the...

Piyush Goyal discusses fresh investment opportunities, deeper business ties with global firms in US
Business
Piyush Goyal discusses fresh investment opportunities, deeper business ties with global firms in US

<p>New York [US], October 6 (ANI): Commerce and Industry Minister Piyush Goyal held separate meetings with senior execut...

CFTC moves to establish comprehensive crypto regulatory framework, seeks public comments
Business
CFTC moves to establish comprehensive crypto regulatory framework, seeks public comments

<p>Washington [US], October 6 (ANI): The US Commodity Futures Trading Commission (CFTC) has begun the process of establi...